股市 | Mudajaya (5085) AGM 2015 ~Part 2
文接 Part 1
CEO James Wong 发表公司走过50年(1965-2015)
-2004年: Bursa listing
-2009年:开始 Independant Power Producer (IPP) 4x360MW coal-fired power plant (天啊,至今已经6年了~!)
-2011年:Civil and structural works for the Janamanjung IV1x1000MV ultra-supercritical coat-fired power plant,the single largest unit in Southeast Asia
-2012年:
1)Mass rapit transit (MRT) Sg Buloh-kajang line package v3 from Dataran Sunway Station to Sec 17, first MRT project in Malaysia
2) EPCC works Tanjung Bin IV 1x 1000 MW ultra-supercritical,coal-fired power plant,the single largest unit in Southeast Asia
-2013年:First Solar Energy project -10MW solar farm in Gebeng Pahang
-2014年:First 2x7MW coal -fired IPP venture in Sulawesi,Indonesia
财政:
Profit loss before tax (RM'000) : (61,605)
Total assets (RM'000) : 1,852,368 资产逐年增加,想必是算进了那些IPP。
Equity attributable to equity holders of the company (RM'000) : 1,101,529 ,比前年减少了-9%
接下来会注重Stabilise,Sustain,Growth
尤其是目前Mudajaya有一班很有经验的工程师和团队,所以必须继续留住和栽培人材。
最瞩目的印度发电厂,竟然照片模糊了= =
Plant 1:All physical work completed,只差什么Grid (当时记得这字),包括administrative/certificate work。
Plant 2:Final stage on physical work,commissioning in progress
无论如何,就是要等到明年。
Expected COD: 2016
2x7MW coal -fired IPP venture in Sulawesi: Physical work 91% completed
Expected COD: 2015
Mass rapit transit (MRT) : 71% completed (Dataran Sunway to The curve)
Expected COD: 2016
126 Span handed over: 1 U to Taman Tun
Tanjung Bin IV 1x 1000 MW: 97% completed
Expected COD: 2016
还有Philip,Cebu 的Wind energy project 是在收集资料阶段(需要12个月左右)
过后是开放给股东发问关于power point 。(我另外part3记录)
其实Shareholder MWSG在10June 寄信去Mudajaya发问问题,而Mudajaya 也回复了,也是大家关注的问题,James Wong也在会中发表。当然有股东发言应该把所有资料都放上Bursa的。
待续 Part 3 ~ 不好意思,我分成3part,想尽量把所有资料都记录起来,所以会很长。
CEO James Wong 发表公司走过50年(1965-2015)
-2004年: Bursa listing
-2009年:开始 Independant Power Producer (IPP) 4x360MW coal-fired power plant (天啊,至今已经6年了~!)
-2011年:Civil and structural works for the Janamanjung IV1x1000MV ultra-supercritical coat-fired power plant,the single largest unit in Southeast Asia
-2012年:
1)Mass rapit transit (MRT) Sg Buloh-kajang line package v3 from Dataran Sunway Station to Sec 17, first MRT project in Malaysia
2) EPCC works Tanjung Bin IV 1x 1000 MW ultra-supercritical,coal-fired power plant,the single largest unit in Southeast Asia
-2013年:First Solar Energy project -10MW solar farm in Gebeng Pahang
-2014年:First 2x7MW coal -fired IPP venture in Sulawesi,Indonesia
财政:
Profit loss before tax (RM'000) : (61,605)
Total assets (RM'000) : 1,852,368 资产逐年增加,想必是算进了那些IPP。
Equity attributable to equity holders of the company (RM'000) : 1,101,529 ,比前年减少了-9%
接下来会注重Stabilise,Sustain,Growth
尤其是目前Mudajaya有一班很有经验的工程师和团队,所以必须继续留住和栽培人材。
最瞩目的印度发电厂,竟然照片模糊了= =
Plant 1:All physical work completed,只差什么Grid (当时记得这字),包括administrative/certificate work。
Plant 2:Final stage on physical work,commissioning in progress
无论如何,就是要等到明年。
Expected COD: 2016
2x7MW coal -fired IPP venture in Sulawesi: Physical work 91% completed
Expected COD: 2015
Mass rapit transit (MRT) : 71% completed (Dataran Sunway to The curve)
Expected COD: 2016
126 Span handed over: 1 U to Taman Tun
Tanjung Bin IV 1x 1000 MW: 97% completed
Expected COD: 2016
还有Philip,Cebu 的Wind energy project 是在收集资料阶段(需要12个月左右)
过后是开放给股东发问关于power point 。(我另外part3记录)
其实Shareholder MWSG在10June 寄信去Mudajaya发问问题,而Mudajaya 也回复了,也是大家关注的问题,James Wong也在会中发表。当然有股东发言应该把所有资料都放上Bursa的。
待续 Part 3 ~ 不好意思,我分成3part,想尽量把所有资料都记录起来,所以会很长。
股市 | Mudajaya (5085) AGM 2015 ~Part 2
Reviewed by Angelpoiwoon
on
10:16
Rating:
谢谢分享
回复删除谢谢uncle jim!
删除想趁机骗篇幅罢了吧XD
回复删除说笑,谢谢分享咯~。~
哎呀,顺便啦,不过是真的很长,接下来还有4张图片,哈哈哈
删除angel
回复删除谢谢无私分享
可以知道 你套牢的价位吗?